Teesta III

SPV name
Teesta Urja Limited
Type
Hydro Electric Power Project
Location
Sikkim
Capacity
1200 MW
COD
2016

Nalo

SPV name
Indus Hydro Power (India) Pvt Ltd
Type
Hydro Electric Power Project
Location
Arunachal Pradesh
Capacity
360 MW
COD
2017

Patikari

SPV name
Patikari Power Private Limited
Type
Hydro Electric Power Project
Location
Himachal Pradesh
Capacity
16 MW
COD
2008

Srivathsa

SPV name
Srivathsa Power Projects Ltd
Type
Gas Based Power Project
Location
Andhra Pradesh
Capacity
17 MW
COD
2002

Bhavanapadu

SPV name
East Coast Energy Pvt Ltd
Type
Coal Based Thermal Power Project
Location
Andhra Pradesh
Capacity
2640 MW
COD
2017

Surajbari

SPV name
Owned by Energy Infratech Pvt Ltd
Type
Wind Power Project
Location
Gujarat
Capacity
10.5 MW
COD
2008
East Coast Energy

East Coast Energy Private Limited (ECEPL) is in the process of developing a Coal based Thermal Power Plant near Kakarapalli Village, Santhabommali Mandal, Srikakulam district, Andhra Pradesh, India. The Project will be implemented in two phases, with each phase constituting 1,320 MW. It is expected to generate 9,828 Million kWh annually at plant load factor of 85% for each phase.

 

Asian Genco has invested in the equity of ECEPL. Partnering in the 2,640 MW coal fired power project are Athena Infraprojects Pvt Ltd and Athena Energy Ventures (A joint venture of IDFC, PTC India Limited and AIP Power). The project is financially closed and has secured land, received allocation of a coal linkage, received environmental clearance from the Ministry of Environment and Forest and the other required clearances.

Phase I (2 X 660 MW) of the Project is under construction and is expected to commission in 2017.

click here to visit
East Coast Energy webpage

© ASIAN GENCO PTE LTD